• Company
  • News
  • Services
  • References
  • Publications
  • Contact
  • Classical structural design in civil engineering
  • Hospital buildings and nursing homes
  • Re-buildings, renovations and reconstructions
  • Halls, roof constructions and industrial buildings
  • Metal-glass constructions
  • Bridge buildings
  • Shells, containers and basins
  • Subway buildings, special foundations, tunnels
  • Special engineering constructions and buildings
  • Building physics and Fire Protection
  • Building dynamics, protections against vibrations and earthquake influence
  • Protection against bomb explosion and impact of vehicles or airplanes
  • Structural supervision and building inspection

Subway buildings, special foundations, tunnels

Various foundations, construction pits, special foundations, special building supports, tunnels and other underground constructions and underwater buildings, e.g.:

  • Subway Munich, line number 3 – station “Karlsplatz” (underpinning of station Karlsplatz) and line number 5 – station “Theresienwiese” (proof engineering)
  • Different multi-anchored walls of construction pits
  • Various building supports with piles and injections
  • Security against buoyancy of groundwater basins with tensile piles
  • Pedestrian tunnel for Munich-Re building
  • Pedestrian tunnel under railway in Zorneding
  • Tunnel Diepoldsberg near Lindau with high retaining walls and anchored securing of slopes
  • Planning of roofs, elevator tubes and finishings for subway stations Munich-Feldmoching, Hasenbergl, St.-Quirin-Platz, Kreillerstrasse, Riem-Ost, Georg-Brauchle-Ring, Marienplatz, Olympiapark Nord and Research Center Garching in Munich (REF 10)

  • Securing of slopes of castle hills Meissen and Nossen (REF 11)
  • Deep construction pits for high-rise buildings Nymphenburger Str. 3, Uptown Munich and “Laimer Wuerfel” in Munich
  • New store building Karstadt-Oberpollinger in Munich with 5 underground levels, building from ground-level to the bottom, foundation and walls in drilled-pile-construction in connection with the existing underground garage with 6 levels underground (REF 09)

Downloads

REF 09: Karstadt - 310 kB
REF 10: subway stations - 274 kB
REF 11: castles sachsen - 290 kB
Customer login
ibdrm GmbH Gravelottestraße 8 D-81667 München
back
print